Our 3D CAD supplier models have been moved to 3Dfindit.com, the new visual search engine for 3D CAD, CAE & BIM models.
You can log in there with your existing account of this site.
The content remains free of charge.
Create a report via History analyzer, that guarantees the systematic and complete recording and evaluation of the creation process of a complete catalog.
On the basis of the QA status levels of each directory or project it becomes clear who had which responsibility at which time. |
|
Optionally export the report as PDF, HTML page, CSV or ZIP file.
Call up the History analyzer. You can find the command in PARTproject at each catalog level (catalog itself, any directories, project).
Determine timeframe, language, and status level(s) to be evaluated.
Per default a starting date of the project is set and for the end date the current date is set. You can limit the range at any time in order to get special analyzes.
The report language can be chosen independent from the current user interface language. Select your preferred language in the list field.
You will receive an analysis in the form of the "pie chart" pictured below. A single analysis of all projects is omitted.
The report opens in the Overview category and shows the sections Current QA-Status assignment, QA-Status assignment (timeframe) and Assignment (CADENAS/ other firm). |
|
Current QA-Status assignment (point of time)
The diagram shows how many percent of the projects are in the respective status at the current point of time.
A finished catalog for example shows everything in green = status 8 or possibly a smaller part with lower status in addition, if new projects are already in work.
QA-Status assignment (timeframe):
The diagram shows the percentage of working time in each single status over the query period.
Assignment (CADENAS/ other firm):
The diagram shows the percentage of working time between customer and CADENAS, thus giving a review of whether the project process is efficient.
Open the report in the Results category.
When and which status change was made is recorded on the time axis for every project.
Under each project the link is displayed. By clicking on the link a detailed history of changes is displayed in tabular form.