Our 3D CAD supplier models have been moved to 3Dfindit.com, the new visual search engine for 3D CAD, CAE & BIM models.
You can log in there with your existing account of this site.
The content remains free of charge.
Usually the selection of the bolt should be the first setting (filtration) .
The following image shows the value range display, after the bolt "GOST 7795_70" was selected.
Green, red and orange values are shown.
Nominal 22 is green: This means that the selected project for this value has an ERP connection.
Nominal 24 is red: This means that the selected project for this value does not have an ERP connection. AND it is not possible to ever reach a "green path" by changing the project selection.
Nominal 30 is orange: This means that the selected project for this value does not have an ERP connection. BUT it is possible to reach a "green path" by changing the project selection.