Our 3D CAD supplier models have been moved to 3Dfindit.com, the new visual search engine for 3D CAD, CAE & BIM models.
You can log in there with your existing account of this site.
The content remains free of charge.
![]() |
Usually the
selection of the bolt should be the first setting (filtration)
.
The following image shows the value range display, after the bolt "GOST 7795_70" was selected.
Green, red and orange values are shown.
Nominal 22 is green: This means that the selected project for this value has an ERP connection.
Nominal 24 is red: This means that the selected project for this value does not have an ERP connection. AND it is not possible to ever reach a "green path" by changing the project selection.
Nominal 30 is orange: This means that the selected project for this value does not have an ERP connection. BUT it is possible to reach a "green path" by changing the project selection.