powered by CADENAS

Manual

Manual

2.3.2.4. Update information

CoCreate Modeling CAD plus ModelManager interface from addONCE replaced by the new CADENAS interface

In order to replace the interface there are two variants possible:

  1. The addONCE installation is „shut down“ and the CADENAS interface is installed. However, thereby all parts are stored a second time in the PDM.

  2. The addONCE installation is „shut down“ and a mapping between the existing parts and the according parts in the new CADENAS solution is performed, which has to be implemented as additional Consulting service. This is the recommended approach, because in this way the parts are not stored a second time in the PDM.

[Note] Note

Mixed environments are not recommended for the productive use, because this is not expedient with regard to the resulting data, especially in the context of PDM systems.